Provide construction of equipment access road off of County Rd. 68 to south side of Nelson Pond.
Provide mass excavation of pond removing accumulated silt deposits and export material to onsite location specified by owner.
Provide removal of section of clay material currently in dam, re-locate and replace with 45 Mil PVC pond liner.
Furnish and install 10,330 SF of 45 Mil PVC liner in pond as per plans.
Furnish and install mechanical attachments and anchor liner to outlet structure.
Provide trenching for 160 LF and furnish and install # 67 3/4" gravel and six-inch schedule 35 PVC perforated pipe.
SRC furnished up to 750 tons of 3/4" gravel
Provide excavation and construction of two clay ground water barriers as per plans.
Provide removal of existing rip-rap on pond bank and provide replacement of same material.
Provide trenching for 197 LF including furnishing and installing six-inch SDR 35 solid pipe with necessary bends
Furnish and install check flap valve at end of 197 LF line.