Sewer Improvements:- Installation of a 15,000 gallon precast concrete tank
- Installation of manhole dosing station with pump.
- Installation of manhole with two-inch flow meter
- Installation of seven leach fields for 10,468 SF total of drain field area.
- Installation of 3,500 lf of three-inch HDPE (High Density Polyethylene) sewer service line with four cleanout manholes.
Water System Improvements:- Excavation, compaction and preparation of tank hole for 60,000 gallon cast-in-place potable water storage tank.
- Installation of all new water main transmission lines and service lines.
- Removal and discontinue old water storage tanks and system.
- Infiltration gallery well:
- Installation of 24.6' X 6' precast manhole for gallery well with aluminum Bilco hatch.
- Installation of Grundfos 1.5 Hp pump on gallery.
- Installation of 1,200 Lf of 2" Hope water service line
- Installation of stainless steel Johnson screen inlet line for well bedded in clean aggregates with PVC liner in trench
| Nelson Pond Reclamation Project
Click» for information about silt removal and pond reclamation |